Global Leader in International Oil and Gas Industry News

posted in:

Statoil confirms indications of gas offshore Tanzania

Monday, Feb 20, 2012

Statoil and partner ExxonMobil confirm that the Zafarani-1 well in Block 2 offshore Tanzania has encountered indications of natural gas in a good quality reservoir.

Drilling operations are still on-going and it is too early to give any indication of size and commerciality.

The well was spudded in early January 2012 and drilling operations are expected to take up to a total of 3 months to complete.

The well is being drilled by the drill ship Ocean Rig Poseidon and is located some 80 kilometres off mainland Tanzania.

It is the first exploration well that has been drilled in the licence which covers an area of approximately 5,500 square kilometers. The water depth at the well location is 2,582 meters and the well itself is planned to reach a total depth of 5,150 meters.

Statoil operates the licence on Block 2 on behalf of Tanzania Petroleum Development Corporation (TPDC) and has a 65% working interest with ExxonMobil Exploration and Production Tanzania Ltd. holding the remaining 35%.

Statoil has been in Tanzania since 2007 when it was awarded the licence for Block 2.

“TPDC is pleased about these preliminary results and is eagerly awaiting further information on this operation,” says Yona Killaghane, Managing Director of TPDC.

The final assessment of what has been encountered will be released at a later stage once drilling operations have been completed and the well results fully analysed.

 

Source: Statoil

posted in:

Other Oil & Gas News

JP Kenny Norway awarded $9 million linnorm contract by Shell 17-05-2012
Statoil transfers Vilje operatorship to Marathon 17-05-2012
Petra Petroleum Inc. announces applications for exploration licences in the Republic of Cyprus 17-05-2012
Westport announces new product enhancements on its Flagship HD15L LNG engine for class 8 trucking 17-05-2012
Canadian oil and gas industry booming shows leading salary guide 17-05-2012
Fairstar Heavy Transport awarded USD 2.9 million rig transportation contract by Seadrill 17-05-2012
Aegean Marine Petroleum Network Inc. announces first quarter 2012 financial results 17-05-2012
Apache's North Sea beryl field well flows 11,625 barrels, 13 MMcf of gas per day; rate is highest for U.K. beryl field since 2001 17-05-2012
Cross Border announces first quarter 2012 financial results 17-05-2012
FieldPoint Petroleum reports increase in borrowing base 17-05-2012