Sound Oil plc announces Rapagnano final test results
Wednesday, Jan 09, 2013

Sound Oil, the Italian focused upstream oil and gas company is pleased to confirm a successful full production test of the Sabbie reservoir at the Rapagnano field in Italy.

The reservoir was tested for two three-hour drawdown periods. The first period on 1/8" choke established a commercial stabilized rate of 9,500 Scmd (0.34 MMscfd) with a flowing well head pressure of 79.2 Bar (1148 psi). No water was produced during the test.  The second period on 3/16" choke confirmed an increased stabilized rate of 13,600 Scmd (0.48 MMscfd) with a flowing well head pressure of 44.5 Bar (645 psi).  The well is now shut in for a final build up period of twelve hours prior to retrieval of down-hole pressure gauges.

All the rate and pressure data obtained from the flow periods were consistent with the Company's reservoir model for production of 1.3 Bscf from the field.

Source: Sound Oil

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

Featured Profile

Featured Videos

Featured Case Studies