Global Leader in International Oil and Gas Industry News

posted in:

Petromin's Morningside oil prospect now on production

Friday, Nov 09, 2012

VANCOUVER, Nov. 8, 2012 /CNW/ - Petromin Resources Ltd (the "Company") is pleased to announce that it has completed construction of the battery facility at the Company's Morningside discovery well (15-23-42-28W4M). The well has now been placed on production with all equipment being powered by casing head gas.

Rates of production will be announced when stabilized. Water cut is minimal. Based on the response, additional offset wells are being proposed, and can now be directionally drilled from the current surface lease containing gas pipeline and battery facility.

Morningside is a multi-zone prospect with additional targets in the Basal Quarts ( Ellerslie) formation and bypassed gas targets in the Glauconitic, Ostracod, Belly River and coalbed Methane (CBM) formations.

Petromin farmed out the drilling of its' 50% working interest at no cost to the Company whereby the Company retains a gross overriding royalty before payout , convertible to a 25% working interest after payout.

The Company retains a 50% working interest in the undrilled acreage and
anticipates further development shortly.

About Petromin Resources Ltd.

Petromin is progressive international petroleum and natural gas exploration and production Company listed Tier 1 on the TSX Venture Exchange. Petromin was ranked 24th of the Top 100 Fastest Growing Companies in BC by Business in Vancouver in 2009 based on a 704% revenue increase over the previous 4 years.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Petromin Resources Ltd.

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Oil & Gas News

Seadrill Limited closes the tender rig T15 transaction 20-05-2013
Petrominerales awarded three blocks in the 11th Bid Round in Brazil 20-05-2013
Tap Oil Limited provide Taunton-5/5H appraisal well - drilling update 20-05-2013
API announces questions still surround BLM hydraulic fracturing regulations 20-05-2013
AWE Limited provide BassGas update Yolla-A achieves significant production increase 20-05-2013
Gran Tierra Energy announces successful acreage awards in Brazil 20-05-2013
Oando Energy Resources announces additional 2,500 bopd production capacity from Ebendo field 20-05-2013
Alexey Miller announces Gazprom to develop Russia-wide Unified Gas Supply System by creating new GTS in East and connecting it to existing GTS in Euro 20-05-2013
Far East Energy announces spudding of 15th and 16th wells of 2013, preliminary drilling results of latest appraisal well 20-05-2013
SPDC declares force majeure on gas supplies to NLNG 20-05-2013