Petromin's Morningside oil prospect now on production
Friday, Nov 09, 2012
VANCOUVER, Nov. 8, 2012 /CNW/ - Petromin Resources Ltd (the "Company") is pleased to announce that it has completed construction of the battery facility at the Company's Morningside discovery well (15-23-42-28W4M). The well has now been placed on production with all equipment being powered by casing head gas.

Rates of production will be announced when stabilized. Water cut is minimal. Based on the response, additional offset wells are being proposed, and can now be directionally drilled from the current surface lease containing gas pipeline and battery facility.

Morningside is a multi-zone prospect with additional targets in the Basal Quarts ( Ellerslie) formation and bypassed gas targets in the Glauconitic, Ostracod, Belly River and coalbed Methane (CBM) formations.

Petromin farmed out the drilling of its' 50% working interest at no cost to the Company whereby the Company retains a gross overriding royalty before payout , convertible to a 25% working interest after payout.

The Company retains a 50% working interest in the undrilled acreage and
anticipates further development shortly.

About Petromin Resources Ltd.

Petromin is progressive international petroleum and natural gas exploration and production Company listed Tier 1 on the TSX Venture Exchange. Petromin was ranked 24th of the Top 100 Fastest Growing Companies in BC by Business in Vancouver in 2009 based on a 704% revenue increase over the previous 4 years.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Petromin Resources Ltd.

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

Member Profiles

Featured Profile

Featured White Paper

Featured Case Study

Featured Video