Global Leader in International Oil and Gas Industry News

posted in:

Petrobras announces FPSO contracting for Iracema Norte area

Wednesday, Nov 14, 2012

Petrobras, as Operator of the BM-S-11 Consortium, announces that, along with its partners BG Group and Petrogal Brasil, and through its affiliate Tupi-BV, has signed a Letter of Intent with Schahin Petróleo e Gás S.A. and Modec Inc. for the charter of the FPSO that will be used in the production development project of the area known as Iracema Norte, in block BM-S-11, in the pre-salt of Santos Basin. The project includes the interconnection of 16 wells to the FPSO – 8 production and 8 injection wells –, and production is expected to start in December 2015.

The FPSO will be installed 300 Km off Brazil’s coast, at a water depth of 2,234 meters. The platform will have a processing capacity of 150,000 bpd of oil and 8 million m3/day of natural gas. It will be operated by the companies responsible for the construction and chartered to the Consortium for a 20-year period. The schedule of the project determines the delivery of the FPSO 35 months following the signature of the Letter of Intent.

The BM-S-11 Consortium is operated by Petrobras (65%), in partnership with BG E&P do Brasil Ltda. (25%) and Petrogal Brasil S.A (10%).

Source: Petrobras

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Oil & Gas News

Chevron recognizes Parman Energy for strong lubricant sales performance 20-05-2013
Dow supports U.S. department of energy LNG export decision 20-05-2013
Seadrill Limited closes the tender rig T15 transaction 20-05-2013
Petrominerales awarded three blocks in the 11th Bid Round in Brazil 20-05-2013
Tap Oil Limited provide Taunton-5/5H appraisal well - drilling update 20-05-2013
API announces questions still surround BLM hydraulic fracturing regulations 20-05-2013
AWE Limited provide BassGas update Yolla-A achieves significant production increase 20-05-2013
Gran Tierra Energy announces successful acreage awards in Brazil 20-05-2013
Oando Energy Resources announces additional 2,500 bopd production capacity from Ebendo field 20-05-2013
Alexey Miller announces Gazprom to develop Russia-wide Unified Gas Supply System by creating new GTS in East and connecting it to existing GTS in Euro 20-05-2013