Global Leader in International Oil and Gas Industry News

posted in:

INPEX launches subsea FEED for the Abadi LNG project

Monday, Nov 26, 2012

INPEX CORPORATION (INPEX) is pleased to announce today that its affiliate INPEX Masela, Ltd. (INPEX Masela) has awarded the contract for the Front End Engineering and Design (FEED*) of its major subsea production facilities for the development of the Abadi LNG Project in Indonesia. The Abadi LNG Project is a liquefied natural gas (LNG) project, which envisions the adoption of the Floating LNG (FLNG) plant constructed and utilized for an annual production of 2.5 million tonnes for the Stage-1 development of the Abadi gas field located in the Masela Block, Arafura Sea, Indonesia.

The successful contractor for the subsea FEED contract is PT Wood Group Indonesia, a subsidiary of John Wood Group plc (Wood Group), a British company, one of the world’s leading engineering companies in the oil & gas E&P business. Wood Group will undertake the subsea FEED for approximately 12 months, which covers the detailed engineering works for SURF, which mainly consists of Subsea production system, Umbilicals, Risers and Flow lines. A separate FEED contract for the FLNG facilities as one of major facilities of this project will be awarded in due course, which is currently under the process of selecting a FLNG FEED contractor.

The Abadi LNG Project is operated by INPEX Masela with a 60% participating interest while Shell holds a 30% participating interest and PT EMP Energi Indonesia, a subsidiary of PT Energi Mega Persada Tbk. holds a 10% participating interest. The Masela Block is located in Arafura Sea, at the eastern part of Indonesia, which measures 3,221km in a water depth ranging from 400m to 900m. The Abadi gas field was discovered in 2000, and the subsequent six appraisal wells and the study results confirmed the sufficient gas reserves for LNG development. In December 2010, the plan of development for Stage-1 (POD-1) was approved by the Indonesian Government that the Abadi gas field will be developed in phases and a FLNG plant will be constructed and utilized for an annual production of 2.5 million tonnes for the Stage-1 development. In parallel to the current FEED for subsea production facilities and the FEED for FLNG, INPEX Masela will further conduct necessary evaluation of the additional development for this promising Abadi gas field.

Commencing FEED for subsea production facilities definitely contributes to ensure the  successful start-up of the Abadi LNG Project and the continuous enhancement of INPEX’s E&P activities as one of the measures for growth, which is in line with the "Medium- to Long-Term Vision of INPEX" announced in May this year. INPEX continues to seek support from the Indonesian Government and other stakeholders for a successful

commercial production from the Abadi LNG Project.

Source: INPEX

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Oil & Gas News

Adipec Awards – Excellence In Energy 2013 Set The Future Energy Agenda 17-05-2013
Total wins 10 exploration licenses during Brazil’s 11th bid round 17-05-2013
OGX and MPX sign an agreement for the sale of a 50% stake in 4 exploration blocks in the Parnaíba Basin 17-05-2013
Pacific Rubiales awarded three blocks in Brazil`s 11th bid round 17-05-2013
KONGSBERG wins contract for deliveries to four drillships 17-05-2013
MHI signs agreement with Mitsui O.S.K. lines to build "Sayaendo" New-generation LNG carrier 17-05-2013
Sound Oil plc announces Rapagnano first gas 17-05-2013
Rosneft Sign Cooperation agreements for expanded use of gas engine fuel 17-05-2013
Max Petroleum Plc provide drilling update 17-05-2013
Petrobras buys the most blocks and offers the biggest signature bonus in the ANP 11th round 17-05-2013