Global Leader in International Oil and Gas Industry News

posted in:

Drilling permit for well 16/2-16 in production licence 501

Tuesday, Nov 13, 2012

The Norwegian Petroleum Directorate (NPD) has granted Lundin Norway AS a drilling permit for well 16/2-16, cf. Section 8 of the Resource Management Regulations.

Well 16/2-16 will be drilled from the Transocean Winner drilling facility at position 58°51’1.14’’ north 02°35’50.55’’ east for Lundin Norway AS in production licence 501.
 
The drilling programme for well 16/2-16 relates to the drilling of an appraisal well in production licence 501. Lundin is the operator with a 40 per cent ownership interest. The other licensees are Statoil Petroleum AS with 40 per cent and Maersk Oil Norway AS with 20 per cent.
 
The area in the production licence consists of parts of blocks 16/2, 3, 5 and 6. The well will be drilled 3.1 kilometres northwest of the 16/2-6 discovery well and 3.1 kilometres east of the 16/2-10 appraisal well on Johan Sverdrup in the central part of the North Sea.
 
Production licence 501 was awarded on 23 January 2009 (APA 2008). This is the eleventh well drilled within the licence area.
 
The permit is contingent upon the operator securing all other permits and consents required by other authorities before the drilling activity commences.

 

Source: Norwegian Petroleum Directorate

posted in:

Other Oil & Gas News

Seadrill Limited closes the tender rig T15 transaction 20-05-2013
Petrominerales awarded three blocks in the 11th Bid Round in Brazil 20-05-2013
Tap Oil Limited provide Taunton-5/5H appraisal well - drilling update 20-05-2013
API announces questions still surround BLM hydraulic fracturing regulations 20-05-2013
AWE Limited provide BassGas update Yolla-A achieves significant production increase 20-05-2013
Gran Tierra Energy announces successful acreage awards in Brazil 20-05-2013
Oando Energy Resources announces additional 2,500 bopd production capacity from Ebendo field 20-05-2013
Alexey Miller announces Gazprom to develop Russia-wide Unified Gas Supply System by creating new GTS in East and connecting it to existing GTS in Euro 20-05-2013
Far East Energy announces spudding of 15th and 16th wells of 2013, preliminary drilling results of latest appraisal well 20-05-2013
SPDC declares force majeure on gas supplies to NLNG 20-05-2013