Global Leader in International Oil and Gas Industry News

posted in:

Alexander Energy Ltd. completes and tests 15-12-56-27W4 Detrital sand oil well

Tuesday, Nov 20, 2012

Alexander Energy Ltd. (TSX VENTURE:ALX), ("Alexander" or the "Company") is pleased to announce the completion and testing of the 15-12-56-27W4 well. The well was drilled, cased, completed, and the initial testing ended on Wednesday, November 14th. At the end of the production test, rates were over 120 barrels of oil per day plus associated gas, although initial production is only expected to range from 60 to 90 barrels per day plus associated gas once it is producing in through the production facilities. Alexander is the operator and has a 94% WI in the well. Construction of pipelines and a production satellite is underway, and production is expected to commence before December 15, 2012.

This is an important well for the Company as it extends our proven field to the north, confirms our seismic data and interpretation, establishes up to 4 additional lower risk development wells, and furthers plans to proceed with the testing of a water flood for the Detrital C Pool.

Forward-Looking Statements: All statements, other than statements of historical fact, set forth in this news release, including without limitation, assumptions and statements regarding reservoirs, resources and reserves, future production rates, exploration and development results, financial results, and future plans, operations and objectives of the Corporation are forward-looking statements that involve substantial known and unknown risks and uncertainties. Some of these risks and uncertainties are beyond management's control, including but not limited to, the impact of general economic conditions, industry conditions, fluctuation of commodity prices, fluctuation of foreign exchange rates, environmental risks, industry competition, availability of qualified personnel and management, availability of materials, equipment and third party services, stock market volatility, timely and cost effective access to sufficient capital from internal and external sources. The reader is cautioned that assumptions used in the preparation of such information, although considered reasonable by the Corporation at the time of preparation, may prove to be incorrect. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements.

Source: Marketwire

To access over 3,000 of the latest oil projects from across the world visit Projects OGP for free trial today

posted in:

Other Oil & Gas News

Dubai Municipality along with Unique System FZE Launch a First-of-its-kind Sandstorm Forecasting Mobile App in the UAE 21-04-2014
TIMCO CNG Celebrates Earth Day 2014 By Opening New Public-Access Compressed Natural Gas Fueling Station In Santa Ana 21-04-2014
Piedmont Natural Gas announces agreement with Camp Lejeune for major expansion of natural gas facilities on base 21-04-2014
AVEVA provides Integrated Engineering & Design solutions to TOTAL E&P Nigeria Limited 18-04-2014
Oando Energy Resources increases deposit for acquisition of Nigerian Upstream Oil and Gas Business of ConocoPhillips 18-04-2014
Linde will be exclusive hydrogen supplier for the Shell Eco-marathon in Houston 18-04-2014
Technip wins Umbilical contract for Kaombo project in Angola 18-04-2014
Forest Oil announces first quarter 2014 earnings release date and teleconference 18-04-2014
Saipem announces awarded FPSO contracts in Angola worth more than $4 billion 18-04-2014
Endeavour announces settlement of SM Energy litigation 18-04-2014